The original building was constructed in 1978 and 1979 by Freightliner with major additions in 1984 (tire shop addition), 1985 (E-coat and plastic line), 1986 (manufacturing engineering building, now customer ready center), 1989 (industrial boiler), 1991 (FL90), 1995 (new plastics and mid-coat lines), and 2001 (new touch-up facility).